CC Roads — Phase III
4.2 km internal cement roads
Cement-concrete roads with side drains across Wards 3, 7 and 9, completing all-weather access to every street in the village.
Every ongoing work in the village, with live progress — reviewed at the monthly Gram Sabha.
Progress figures come from the Engineering Assistant's measurement book and are updated after each site inspection.
4.2 km internal cement roads
Cement-concrete roads with side drains across Wards 3, 7 and 9, completing all-weather access to every street in the village.
1.8 km covered drains
Replacing open drains along the bazaar and bus-stand stretch with covered RCC drains and silt chambers.
100% functional household taps
Extending piped water to the last 68 households in the colony hamlets and installing a new 60,000-litre OHSR.
220 smart LED poles
Solar LED street lights with CCMS remote monitoring across all 11 wards — cutting the Panchayat's power bill by an estimated ₹4.8 lakh a year.
FTTH to institutions & homes
Fibre broadband to the school, PHC, Panchayat office and 400+ homes, plus free Wi-Fi zones at the bus stand and library.
12,000 saplings by 2027
Avenue plantation on the tank bund and approach roads, plus fruit-tree distribution to households — 7,400 saplings planted and geo-tagged so far.
Dedicated 11 kV farm feeder
Separating the agricultural feeder to give farms reliable 9-hour daytime power without disturbing household supply.